Key takeaways
- The steps behind the siding decide whether it stays dry.
- Old siding comes off so the wall can be inspected and repaired.
- Weather barrier and flashing go on before any siding.
- A final walk-through catches small items before the crew leaves.
Before the work begins
The job starts with a walk-through of the house, a look at what is on the walls and a discussion of materials, colors and trim. Permits are pulled where needed, materials are ordered and the schedule is set. Good crews protect plants and walkways and tell you what to expect each day.
Tear-off and repair
Old siding, trim and wrap come off, and the wall is inspected. Soft or damaged sheathing and framing are repaired. This is the moment to find hidden moisture damage, correct poor flashing and sometimes add insulation or air sealing. Skipping this step is how new siding ends up over old problems.
Wrap, flash and install
The weather barrier goes on first, lapped so water drains down and out. Windows and doors are flashed in the right order. Starter strips, corners and trim are set, and siding goes up course by course, with correct fastener placement and gaps for movement. Cuts, penetrations and transitions are sealed and detailed.
Trim, finish and cleanup
Soffit, fascia, gutters and accents are finished or reinstalled. Caulk and any paint are completed. The crew sweeps the yard, runs a magnet over the grounds to collect nails and walks the house with you to check each wall.
Official sites to explore
Brand names and logos belong to their owners. These links open the official websites in a new tab, and we are not affiliated with them.
Quick answers
How long does a siding job take?
A typical home can take from several days to a few weeks, depending on size, material and weather.
Do I need to be home during installation?
Usually not, though we keep you informed and need access to the exterior.
What can delay a siding project?
Weather, material availability, hidden damage and permit or HOA approval are the usual causes.